I believe these Martin Lake BNSF coal trains do not get loop at the plant when they are unloaded? So once in awhile the extra DP power put on at Pittsburg, leads the empties back north. As is the ... (more)
Probably something that could be seen alot more in the near future if the CP and the KCS get their wish. This is the DP power on the back a rock train that has just arrived at its destination at H... (more)
A 1x2 powered rock has just arrived at its destination at Hatton on the Shreveport Sub. The train is slowing up to let the conductor off so they can shove around the north leg of the wye. The trai... (more)
A northbound rail train fights the 1.1% grade into Hatton. The train is working north towards the next crew change point at Heavener, OK, 70 miles ahead. The train is only using one of their GE's ... (more)
Southbound grain
KCS rocks trains at the Martin Marietta Hatton Quarry lead.